Toll Free: 1-800-545-5420
Section Name

Application Rates

Topical only Undiluted concentrate
Parts Water
Traffic Area Dilution
Life/
months
Standard Metric
gal./
Acre
gal./
SY
ft²/
gal.
gal./
ft²
yd²/
gal.
gal./
yd²
gal./
acre
m²/
gal
gal./
m²/
L
L/

Water Retention Basin & Pond Lining

20

0.0500

2.2

0.450

2178

1.9

0.538

0.5

2.04

2

No

6534

1.35

12-24

Aircraft Runways (Heavy use)

35

0.0286

3.9

0.257

1245

3.3

0.308

0.9

1.16

4

Yes

6223

1.29

12-24

Aircraft Runways (single engine)

50

0.0200

5.6

0.180

871

4.6

0.215

1.2

0.81

6

Yes

6098

1.26

12-24

Helicopter Landing Pads (Heavy Craft)

45

0.2220

5.0

0.200

968

4.2

0.239

1.1

0.91

5

Yes

5808

1.20

12-24

Helicopter Landing Pads (Light Craft)

70

0.0143

7.8

0.129

622

6.5

0.154

1.7

0.58

8

Yes

5601

1.16

12-24

Heavy Haul Roads & Mining Roads

60

0.0167

6.7

0.150

726

5.6

0.179

1.5

0.68

6

Yes

5082

1.05

12-24

Military Convoy & Supply Roads

65

0.0154

7.2

0.138

670

6.0

0.166

1.6

0.63

6

Yes

4691

0.97

12-24

Roads (High Traffic)

65

0.0154

7.2

0.138

670

6.0

0.166

1.6

0.63

6

Yes

4691

0.97

12-24

Residential Driveways

65

0.0154

7.2

0.138

670

6.0

0.166

1.6

0.63

6

Yes

4691

0.97

12-24

Parking Lots

65

0.0154

7.2

0.138

670

6.0

0.166

1.6

0.63

6

Yes

4691

0.97

12-24

Roads (Light Traffic)

70

0.0143

7.8

0.129

622

6.5

0.154

1.7

0.58

7

Yes

4978

1.03

12-24

Golf Course Bunker Liner

50

0.0200

5.6

0.180

871

4.6

0.215

1.2

0.81

5

Yes

5227

1.08

12-24

Golf Course Cart Paths

80

0.0125

8.9

0.113

545

7.4

0.135

2.0

0.51

8

Yes

4901

1.01

12-24

Walking Trails and Paths

100

0.0100

11.1

0.090

436

9.3

0.108

2.5

0.41

10

Yes

4792

0.99

12-24

Road Sealer over Soiltac Stabilized Base

100

0.0100

11.1

0.090

436

9.3

0.108

2.5

0.41

4

Yes

2178

0.45

12-24

BMX Tracks

120

0.0083

13.3

0.075

363

11.1

0.090

2.9

0.34

10

Yes

3993

0.83

9-16

Temporary Parking Lots

120

0.0083

13.3

0.075

363

11.1

0.090

2.9

0.34

10

Yes

3993

0.83

1-3

Temporary Roads & Detours

150

0.0067

16.7

0.600

290

13.9

0.072

3.7

0.27

13

Yes

4066

0.84

1-3

Road Shoulders

160

0.0063

17.8

0.056

272

14.9

0.067

3.9

0.25

14

Yes

4084

0.84

12-24

Slope Erosion Control (Steep Slope)

100

0.0100

11.0

0.090

436

9.0

0.108

2.9

0.41

5

Yes

2614

0.54

12-24

Slope Erosion Control (Average Slope)

180

0.0056

20.0

0.050

242

17.0

0.060

4.0

0.23

10

Yes

2662

0.55

12-24

Slope Erosion Control (Light Slope)

220

0.0045

24.0

0.041

198

20.0

0.049

5.0

0.19

12

No

2574

0.53

12-24

Stock Pile Dust Capping (Steep Slope)

220

0.0045

24.0

0.014

198

20.0

0.049

5.0

0.19

9

No

1980

0.41

12-24

Stock Pile Dust Capping (Average Slope)

270

0.0037

30.0

0.033

161

25.0

0.040

7.0

0.15

12

No

2097

0.43

12-24

Stock Pile Dust Capping (Light Slope)

320

0.0031

36.0

0.028

136

30.0

0.034

8.0

0.13

14

No

2042

0.42

12-24

Hazardous Material Capping & Sealing

160

0.0063

18.0

0.056

272

15.0

0.067

4.0

0.25

8

No

2450

0.51

12-24

Landfill Capping & Reclamation

360

0.0028

40.0

0.025

121

33.0

0.030

9.0

0.11

10

No

1331

0.28

12-24

Odor & Vapor Suppression

360

0.0028

40.0

0.025

121

33.0

0.030

9.0

0.11

20

No

2541

0.53

12-24

Mine Tailings Capping & Reclamation

450

0.0022

50.0

0.020

97

42.0

0.024

11.0

0.09

12

No

1258

0.26

12-24

Coal Rail Car Capping

1000

0.0010

111.0

0.009

44

93.0

0.011

25.0

0.04

29

No

1307

0.27

1+

No Traffic
Dust Control (30 Days)

1250

0.0008

139.0

0.007

35

116.0

0.009

31.0

0.03

34

No

1220

0.25

1+

No Traffic
Dust Control (90 days)

795

0.0013

88.0

0.011

55

74.0

0.014

20.0

0.05

21

No

1205

0.25

3+

No Traffic
Dust Control (6 Months)

580

0.0017

64.0

0.016

75

54.0

0.019

14.0

0.07

15

No

1202

0.25

6+

No Traffic
Dust Control (12 Months)

415

0.0024

46.0

0.022

105

39.0

0.026

10.0

0.10

11

No

1260

0.26

12+

No Traffic
Dust Control (12-24 Months)

320

0.0031

36.0

0.028

136

30.0

0.034

8.0

0.13

8

No

1225

0.25

12-24

Hydroseed & Hydromulch Tackifier

1740

0.0006

193.0

0.005

25

162.0

0.006

43.0

0.02

40

No

1026

0.21

3-6

(Mixed-In/Processed)

Base Stabilization Light (4"-10cm deep)

45

0.0222

5.0

0.200

968

4.2

0.239

1.1

0.91

**

Base Stabilization Average (4"-10cm deep)

35

0.0286

3.9

0.257

1245

3.3

0.308

0.9

1.16

**

Base Stabilization Heavy (4"-10cm deep)

25

0.0400

2.8

0.360

1742

2.3

0.431

0.6

1.63

**

Road Pot Hole Repair (4"-10cm deep)

25

0.0400

2.8

0.360

1742

2.3

0.431

0.6

1.63

**

Adobe Blocks & Earth Blocks (6"-15cm Tall)

35

0.0286

3.9

0.257

1245

3.3

0.308

0.9

1.16

**

Base Stabilization Light (6"-15cm deep)

35

0.0286

3.9

0.257

1245

3.3

0.308

0.9

1.16

**

Base Stabilization Average (6"-15cm deep)

25

0.0400

2.8

0.360

1742

2.3

0.431

0.6

1.63

**

Base Stabilization Heavy (6"-15cm deep)

15

0.0667

1.7

0.600

2904

1.4

0.718

0.4

2.72

**

**Dilution rates for mix-in/processed applications are based on the difference between optimum moisture and in-situ moisture levels.
Please consult with your local Soiltac® representative to calculate recommended dilution rates for all mix-in applications.

Application coverage and dilution rates may vary depending on traffic volume, load bearing capacity, soil type, weather conditions, soil moisture levels and compaction. All Mixed-in/Processed applications require laboratory and on-site testing to determine optimal application and dilution rates.